08-14-09 Bill Volcko's front fork shock assembly (1)
08-14-09 Close up of fairings (1)
08-14-09 Installing Jury Struts (1)
08-14-09 Installing left main wheel pant (1)
08-14-09 Installing main strut fairings (1)
08-14-09 Jury Strut installation (1)
08-14-09 Nose shock completed (1)
08-14-09 Nose wheel completed (1)
08-14-09 Right wheel pant completed (1)
08-14-09 Rivnut installed into pant retainer plate (1)
08-14-09 Strut and Jury Strut fairings completed (1)
07-09-09 Airleron push tubes completed
07-09-09 Completed strobe light wiring
07-09-09 Completed wheel pants stripping
07-09-09 Blue stripe complete
07-09-09 Fuselage at hangar
07-09-09 Installing aileron push tubes
07-09-09 Installing jury struts
07-09-09 Installing wing gap covers
07-09-09 Neal, Stella and Rich trailoring to airport
07-09-09 Prepping for blue paint
07-09-09 Red stripes painted
07-09-09 Windscreen installation
07-09-09 Wing installation crew
07-09-09 Wings attached .... Almost ready
07-09-09 Wings ready for installation
06-05-09 Checking security before ride to airport
06-05-09 Wings on trailor going to airport
06-05-09 Access to Fuel Pump
06-05-09 Aligning the elevators
06-05-09 Tape removal
06-05-09 Installing Rotax 503 engine
06-05-09 Blue stripe masking
06-05-09 Exhaust completed
06-05-09 Engine ready to be installed
06-05-09 Prop torqed and safety wired
06-05-09 Elevator push rods installed
06-05-09 Red stripe front fuselage completed
06-05-09 Engine wiring and hook up completed
06-05-09 Tail and dorsal fin
06-05-09 Striping tail section
06-05-09 Masking for blue stripes
06-05-09 Masking for red stripes
06-05-09 Installing tail section
Another week of drying time - finish coat over epoxy primer
Ben cleaning fiberglass parts
First epoxy coat - jury strut and wheel fairings
First epoxy coat wheel pants and wing gap covers
First fininsh coat of ploy tone over epoxy primer
Masking
Masking
One week drying time for epoxy primed parts
Top wing surfaces - Striping complete
Bottom right wing
Finished red and blue colors
Installing aileron
Taping for stripes
Top right wing colors
02-15-09 Finished coat applied to wing bottoms
02-15-09 Fuel set up using Elevator Bellcranks and fule manifold with pressure switch
Another angle fabric covering
Finishing tapes being installed
Hinged Lexan doors installed
Installing fiberglass gear fairing
Conduit terminations and wiring - engine area
Completed wiring
Fitting and taping tail section
Applying finishing tape
Fabric covered inspection ports
First coat of Poly Brush
Inspection ring cut outs
Ribs masked out for finishing
Tightening top right wing fabric
Ironing out the wrinkles
Covering top right wing
Right wing ready for fabric
Right wing ready for fabric
Left wing complete
First coat of poly paint
Large flanged rivets installation
Pulling rivets
Stella installing reinforcing tape
Stella working the fabric
Left wing bottom covering
Left wing bottom covering
Ply brushed ailerons
Poly brushing tail surfaces
Strobe wires
Bottom right wing complete
Completed left & right wing
Fuselage
Inside outside wing braces
Left aileron hings assembly
Nose cone cut out
Panel less pressure gauge
Partial control panel
Right wing tip installation
RW erap sheet
Tail section ready for spray
.